Ridgway/Cyclone, PA – The Pennsylvania Department of Transportation Elk/McKean County Maintenance announces the following work schedule for the week of September 28- October 2, weather permitting. Motorists should travel with extra caution in these and all work areas. Motorists should be aware that due to the nature of highway maintenance and emergency work, crews could be working on any highway at any time of the day or night.
This work will be done in accordance with Centers for Disease Control and state Department of Health guidance as well COVID-19 safety guidance, including protocols for social distancing, use of face coverings, personal and job-site cleaning protocols.
Elk County
Pipe Replacement:
● State Route: 1008 Woodland Rd., St. Mary’s
Shoulder Repair:
● State Route: 1001 Glen Hazel Road, St. Mary’s
Painting Curve Warnings:
● State Route: Various Routes, County wide
Patching:
● State Route: 120 Diamond area & 1001 Glen Hazel Rd.
Crack Seal:
● State Route: 948 Montmorenci & 219 Bootjack
McKean County
Patching:
● State Route: 59 Ormsby Hill & 3011 Bridge Road
Sign Repair:
● State Route: Various County wide
The following work is scheduled to be completed by contractor, weather permitting:
Kinzua Creek Bridge/SR-3006-A01/McKean County: Clearwater Construction Co.:
Overall Project Description:
ECMS 4460 – On State Route 3006 (Westline Road) from Segment 0010/Offset 0189 to Segment 0010/Offset 1314. For the removal of the existing Two-Span Steel I-Beam bridge and construction of its replacement Two-Span Composite P/S Bulb-Tee Beam Bridge, a temporary roadway including temporary bridge are to be used for traffic control. Approach work consisting of super pave asphalt mixture designs for the base, binder, and wearing course, guide rail, pavement markings, management and disposal of potential hazardous materials, and miscellaneous construction for a construction length of approximately 735 feet (0.139 miles) as indicated on the approved drawings.
Next Week:
Contractor will be welding and installing steel pipe casing for NFG gas line installation. They will structure backfill and structure foundation drain. The contractor will also be excavating for subgrade treatment under approach slab areas.
Traffic will be controlled by temporary traffic signals until completion of the new structure this fall.
Drivers are reminded to watch for stopped vehicles and to obey the posted speed limits and construction signing.
Work to be performed Monday through Friday during daylight hours, weather permitting.
SR-6 McKean County, Hamilton Twp. Contractor: Glenn O. Hawbaker, Inc.
The work zone is located at the Warren/McKean County line 5 miles east towards Kane in Hamilton Twp., and will feature an alternating traffic pattern controlled by flaggers.
Next Week: NO CHANGE
The contractor will begin work on Monday morning at 7:00 A.M. and continue through Friday afternoon. All work will be performed during daylight hours.
The contractor will begin performing inlet repairs in the town of Ludlow.
All work is weather and schedule dependent. Motorists are advised to watch slow-moving and stopped vehicles through entire work zone. Motorists are advised to be cautious when traveling through the work zone and should obey the posted speed limit.